Case for Crown Ridge bulk mining

GOLD Mountain has said that recent geophysical modelling continues to build a case for bulk mining at its Crown Ridge project near Wabag in Enga Province.

  • Staff Reporter
  • 10 April 2017
  • 06:13
  • News
Case for Crown Ridge bulk mining

Related Content

The company said that the modelling indicated that Crown Ridge was above a potential 4km continuous intrusive with an extensive layer of weather rock, consistent with near-surface geology confirmed in bulk sampling pits.
 
Gold Mountain said that bulk sampling would be ramped up shortly with the aim of establishing a resource from the results.
 
"Gold Mountain's technical team believes that these soils will continue to host much more free gold and platinum, as has been proved by the bulk sampling to date," the company said.

 

33-member Cabinet named

33-member Cabinet named

11 August 2017 05:15

PNGIndustry newsletter

Mining

Ok Tedi renews power contract

Ok Tedi renews power contract

Manage, operate and maintain deal

LNG

PNG LNG record broken

PNG LNG record broken

Top production rates, despite shutdown

Community

Hela Health leaps ahead

Hela Health leaps ahead

Improved over past 18 months, but challenges not over yet